I will advocate for the repair and improvement of our roads, bridges, water systems, and facilities to support safe, efficient, and sustainable growth.

Highway 6 and Haldibrook Road

After much public pressure and a petition presented to the legislature by our MPP asking for more immediate attention, updates suggest that a design option is being developed with a 2028 construction plan.

Said plan will be subject to approvals and utility relocations.

It appears from early discussions that stop lights are being considered. A consultation period has been implemented for people to provide input.

Personally I believe stop lights are a traffic flow nightmare, given the volume of traffic and especially truck traffic.

In my opinion, a signalized intersection is not the best or permanent solution, but a 2-step solution which has additional cost to it.

Having said this, if the stop lights, as an interim measure, save just 1 life, it will have been worth it.

In my opinion, a properly designed roundabout for cars and trucks with appropriate education on how to use them and/or an over/under pass is the ultimate solution.

Addressing the Infrastructure Deficit

I do propose that staff be given direction to prepare budgets that deliver a lower-than-inflationary increase, plus perhaps an accommodation for some increase for future capital requirements, required given the size and urgency of our infrastructure deficit.

With this direction, staff would be challenged to find the savings.

I am convinced there are savings and increased revenue opportunities that can be explored before we ever consider cuts.

Water and Wastewater Infrastructure

A complete review of all County capital assets should be conducted, comprising land, land improvements, buildings, leasehold improvements, infrastructure, Information Technology, machinery and equipment, and vehicles.

The review and any required appraisals to support values would be used to determine what holdings are excess to the current, medium- and long-term requirements of the County.

Excess values could determine whether outright sale or sale-leaseback should be considered to create additional liquidity.

Public Transit

Getting People Where They Need to Go

At a time when growing concern about climate change is front and centre, it appears the County needs to do more to make people mobile without the need for each of us to get in our vehicles to move around town, the County or to other destinations for work, living and play.

Revisiting the Feasibility

I understand that Council had, at some point in the past, considered the question of public transit but, in the end, felt it was cost-prohibitive. There is a significant, if not greater, cost to not doing something, especially as it relates to reputational risk and the resulting negative impacts on attracting investment, than doing something unique for our taxpayers.

If elected, I will be asking Council to consider revisiting the feasibility and affordability.

Water Drainage

The Impact on Properties

Several people have spoken about the water drainage issue in the County and the negative impact on their properties as a result of historically high water levels, aging infrastructure and its inability to keep up, and the rules and potential cost to them of fixing it—all covered under Ontario’s antiquated Drainage Act.

Complaints are often from farmers with farmland that floods, road flooding, and water in basements near municipal drain outlets.

Aging Drains and Infrastructure

The core problem appears to be water volumes and the age of the drains, ditches and tile outlets built decades ago.

Many Ward 5 shoreline drains move into tributaries that, in times of heavy rains and/or higher Lake Erie water levels, are backing up. Our old, antiquated drainage system was not designed for these levels of water.

Some of the Issues

As I understand it, these are some of the issues:

The County still operates under a 10-year maintenance cycle of major cleanouts, brushing, etc. Some drains are decades old, some 50 or more years, and repairs are expensive. The drain work requires tenders and is only done in drier periods. Given there are only so many contractors that can do the work, response can be slow.

Under the Drainage Act, landowners who benefit must pay a share based on old engineer reports.

Those impacted are seeking faster emergency response, more frequent maintenance than every 10 years and a more equitable split of costs because, in their view, land use and water levels have changed and the Act has not kept up with these realities.

What I Will Ask Staff to Review

If elected, I will be asking staff to review and report back on the following:

  • Given the change in weather patterns and lake levels, the 10-year maintenance cycle is not frequent enough. What can we do to speed it up, and what are the cost implications?
  • What can be done to expedite response times?
  • A review of the split in cost, given the old information we rely on to arrive at the split percentage, and given the apparent failures linked to the protracted 10-year maintenance plan.
✓ KEY POINTS
  • Repair and improve roads, bridges, water systems and facilities.
  • Growth must be matched with infrastructure that can safely accommodate it.
  • Account for the cumulative impact of increasing density on the transportation network.
  • Address priority water and wastewater infrastructure deficits.
  • Review capital-project timing, financing and infrastructure costs.
♡ WHY THIS MATTERS

Delays in securing infrastructure improvements to support the pace of housing could have a negative impact on quality of life and cost us heavily in the long run.

Decisions must consider the capacity of our road networks and infrastructure, the impact on existing residents and business, and the safety of current and future residents.